Repair shop update
Waiting on supplier 7 days. At risk.
Purchasing material.
Shop sync yesterday, 6:10 AM ET. Day 22.
Updated by the shop yesterday. Day 22 of 34.
Native shop step
46 PENDING E.U.
Waiting on supplierResponsible
Pravin HSA purchasing
Since Aug 27, 7 days. Set by John.
Latest note Sep 2, 4:12 PM ET pauses pings until Sep 3, 4:12 PM
Bearing PO goes out today. Sleeve: Skyline quoted $1,180, ESD Sep 10, waiting on two more by Thursday. Connector ESD Sep 11 still unconfirmed, called ASA.
Last pinged Sep 1 by Frank. A fresh note pauses pings for 24h.
For
Pallas Aero Services
Fuel Metering Unit JFC800-1
Received
Aug 12
Day 0
Promised
Sep 15
Estimate rev 1
Need by
Sep 22
Aircraft slot
Waiting
13d
4 on customer, 7 supplier, 2 shop
Pings
1
Sep 1, Frank to Pravin
Your open actions
1
Approved
$18,900rev 1
Committed
$6,36034% of rev 1, $2,190 estimated
Blocking
2 linesbearing PO, sleeve vendor
Latest supplier date
Sep 11connector, unconfirmed
| Part | Qty | Condition | Vendor quotes | Best | Supplier date | Status | |
|---|---|---|---|---|---|---|---|
145-3010 Duplex ball bearing | 2 | NE | AeroHub Distribution $3,750 · 2 others declined | $3,750 | Sep 9 if placed today | Ready to order | |
301-7720-12 Sleeve, metering valve | 1 | NE or SV | Skyline Aero $1,180 NE · Northgate Supply asked Aug 28 · Delta-K asked Aug 28 | $1,180 | Sep 10 | 1 of 3 quotes in | |
BACC10HY5 Connector | 1 | NE | Airline Spares America $420 | $420 | Sep 11 unconfirmed | PO placed Aug 27 |
| Part | Qty | Source | Cost | Supplier date | Status | |
|---|---|---|---|---|---|---|
23004500-101 Overhaul gasket kit | 1 | OEM | $2,190 est. | Sep 8 | PO placed Aug 27 | |
MS28775-012 Packing, preformed. Shelf-life item. | 4 | HSA stock, bin C-14 | $12 | On hand | Pull at build | |
NAS1149FN816P Washer, flat | 8 | HSA stock, bin H-02 | $4 | On hand | Pull at build |
Estimate rev 1
$18,900.00 USD, firm
Lead time 20 days from approval. Promised Sep 15. 550259-estimate.pdf
Sent by the shop Aug 22, 1:05 PM ET. Approved by D. Marsh, Pallas Aero Services Aug 26, 9:40 AM ET.
No revision pending. A revision arrives by email with a link to this page, and the decision is one tap here.
Unit received on the inbound shipment, tag matched to serial 550259. WO 550259 opened the same day. Disposition Repair: not BER, not RAI, not scrap. No customer-supplied parts in the box.
Received and logged by the shop.
Inbound tracking
1Z999AA10123456784
Received by
HSA receiving
Incoming condition
Unserviceable, removed for leak
Findings: metering valve sleeve scored, two O-rings hardened, duplex bearing rough. Two days at 11 PENDING TECH waiting on the senior tech's disposition.
Findings are in the estimate you approved.
Approving the WO in Athena sent the quote to Pallas with a link to this page. Responsible during the wait: D. Marsh, Pallas. Pinged once, Aug 24.
You approved rev 1 on Aug 26. Open the quote.
Line detail, vendor quotes, and the Gonzo inbox are under Materials.
The shop is sourcing repair material. Nothing needed from you.
Shop average for this part family, not a schedule. Responsible passes to the assigned tech when the stage opens. Steps 50 READY TO BLD, 51 ASSEMBLY.
Repair and assembly.
Steps 59 PENDING TEST, 60 FINAL TEST. A failed test adds a repeat count and a hold, the strip never rewinds.
Final testing.
Records required before the unit ships. Return instructions are asked for at final inspection. Responsible passes to QA at 70 FINAL INSP, then to the customer at 90 CUST INSTRU.
Invoice for the approved estimate, $18,900, plus any approved revision. Terms net 30 from ship.
Visible only to Higher Standards Aerospace. Share a note from the Responsible card to show it to Pallas.
Pallas planner said the Sep 22 slot can flex to Sep 24 if we call ahead.
| Order | Customer | Shop | Stage | Day | Promise | Responsible | Note | Waiting on | Risk | Status |
|---|